Rehabilitation San Sebastian Breakwaters

Rehabilitation San Sebastian Breakwaters

San Sebastian, Spain

Service: Detailed Design
Client: Basque Government
Period: 2018

The noses of the breakwaters of the Port have been monitored topographically since 2011 to evaluate the progress of the damages until then detected, mainly cracks on the pavements and undercuts on the base of the docks.

The scope of the project included the rehabilitation of both noses, placing 73 concrete piles of 85 cm of diameter in front of the noses, the dredging of the mouth, and the placing of protection blocks at the bed of the mouth. The blocks weighted 500kg when placed in a single layer, and 200kg when placed in a doubled layer.

Contacto

GPO GROUP

GPO SPAIN

Tel. (+34) 932 470 069
gpo@gpogroup.com

GPO USA

Tel. (+1) 212.598.9010
info@samschwartz.com
www.samschwartz.com

GPO BRAZIL

Tel. (+55) 11 3335-2125
comercialbrasil@gpogroup.com

GPO COLOMBIA

Tel. (+57) 310-4780491
colombia@gpogroup.com

GPO PERU

Tel. (571) 999488474
peru@gpogroup.com

GPO ARGENTINA

Tel. (+54) 11 5291 1800/2800
argentina@gpogroup.com