Pumping Station in Sant Boi de Llobregat
GPO was awarded with the Detailed Design of the Regulating Reservoirs in elevation 70 and 95, pumping station and pressure regulating reservoir of elevation 95 in Sant Boi de Llobregat. The purpose of the project is providing the basic design and the subsequent integration into the planning, as well as the environmental impact assessment of two drinking water reservoirs of 45.000 m3 and 25.000 m3 in elevation +70.00 and +95.00 respectively placed in Montbaig Forest Park of Sant Boi de Llobregat.