Kostal Factory
Barcelona, Spain
Service: Detailed Design and Construction Supervision
Client: Kostal Eléctrica
Period: 2015 – 2018
GPO carried out the Detailed Design and Construction Supervision services for the renovation of the conditioning system of the Kostal Eléctrica factory in Sentmenat, Barcelona. Kostal is a company from the automotive industry whose activity is the design, development and industrialization of electromechanical and mechatronic elements. The project was aimed at the renovation of the conditioning system of three production plants, with a total surface of 9.000 m3 and considering the overpressure of the top floor.