Signaling and Electrification Systems
ADIF is the public entity responsible for the construction and operation management of Spanish railway lines. In December 2015, it was managing 15,384 kilometers of railways and 1,903 stations, 41 of them were high speed. The conventional network has a length of 11,471 km of Iberian gauge tracks, with a maximum speed of 200 km/h.
GPO was awarded with the Independent Safety Assessment for the upgrading of signaling and electrification systems for ADIF. Specific reports on the established processes in each phase are issued for each of the projects to be assessed. Subsequently, a safety assessment report is prepared for each of the subsystems to be included in the safety dossier, as well as a non-regression independent evaluation report of the modifications.