Extension of the Sabadell FGC line

Extension of the Sabadell FGC line

Sabadell, Spain

Service: Construction Supervision
Client: Infraestructures de la Generalitat de Catalunya,
S.A.U. (Icat)
Period: 2008 – 2019

The Generalitat de Catalunya (autonomous government of Catalonia) improved the railway connection between the areas of Barcelona and Vallès Occidental (the two most populated in the region) with 2.5 million and 1 million inhabitants, respectively. The Barcelona – Vallès line is used by approximately 3.7 million passengers per year and it has a total length of 38 km.

GPO carried out the construction supervision for the extension of the Sabadell FGC line, with a total length of 5,247 m. It includes a double tunnel with two tubes of 6 m in diameter and 2,912 m of length, five new underground stations and approximately 2,000 m of artificial tunnel. The work also includes the new depots and shunting area, both structures with a length of 300 m.

Contacto

GPO GROUP

GPO SPAIN

Tel. (+34) 932 470 069
gpo@gpogroup.com

GPO USA

Tel. (+1) 212.598.9010
info@samschwartz.com
www.samschwartz.com

GPO BRAZIL

Tel. (+55) 11 3335-2125
comercialbrasil@gpogroup.com

GPO COLOMBIA

Tel. (+57) 310-4780491
colombia@gpogroup.com

GPO PERU

Tel. (571) 999488474
peru@gpogroup.com

GPO ARGENTINA

Tel. (+54) 11 5291 1800/2800
argentina@gpogroup.com