El Dorado Airport
The concessionaire company OPAIN trusted GPO to carry out the design of the new terminal with a surface of more than 62.000 m2 and 70.000 m2 of parking and maneuvering areas, which will be developed in this second phase of extension and renovation of the airport, that will increase its operative surface by 35%.