AP-7 Highway Extension

AP-7 Highway Extension

Gerona, Spain

Service: Health and Safety Coordination
Client: AUTOPISTAS, Concesionaria Española, S.A.
(ACESA)
Period: 2010 – 2014

The project consisted of the extension of a third and fourth lane along the AP-7 toll highway near Girona. The construction was carried out by widening both the outside and inside of the roadways. All the extensions were carried out with the highway in service and with considerable earthworks in clearing and embankment. The work includes drainage works, bridges and channels, overpasses and underpasses, and the enlargement of three major viaducts: the viaduct over the River Ter, the viaduct over the River Xunclà and the viaduct over the River Guilana.

Contacto

GPO GROUP

GPO SPAIN

Tel. (+34) 932 470 069
gpo@gpogroup.com

GPO USA

Tel. (+1) 212.598.9010
info@samschwartz.com
www.samschwartz.com

GPO BRAZIL

Tel. (+55) 11 3335-2125
comercialbrasil@gpogroup.com

GPO COLOMBIA

Tel. (+57) 310-4780491
colombia@gpogroup.com

GPO PERU

Tel. (571) 999488474
peru@gpogroup.com

GPO ARGENTINA

Tel. (+54) 11 5291 1800/2800
argentina@gpogroup.com